EurOmax Applies to the British Columbia Supreme Court
September 02, 2010
Euromax Reports Second Quarter Results
August 31, 2010
EurOmax Annual General Meeting Adjourned
August 25, 2010
EurOmax Reminds Shareholders to Vote their BLUE Proxy By Friday, August 20, 2010
August 18, 2010
EurOmax Shareholder Conference Call – August 12, 2010
Listen to this News (MP3)
August 12, 2010
EurOmax Announces Glass Lewis & Co. Recommendation That Shareholders Vote Their BLUE Proxy In Support Of The Management Director Nominees
August 12, 2010
REMINDER - EurOmax to Hold Conference Call on Thursday, August 12, 2010
August 11, 2010
News Releases
152 files
Financial filings
39 files
Other Regulatory Filings
9 files
Technical Reports
13 files
Corporate Presentations
2 files
Press Clippings
20 files

VANCOUVER CANADA: EurOmax Resources Limited (TSX-V: EOX) ("EurOmax") is pleased to announce high grade gold results from recent diamond drilling at Breznik including 2 metres at 19.9 g/t gold and 23 g/t silver followed by 2.8 metres at 12.4 g/t gold and 4 g/t silver and 1 metre at 43 g/t gold and 12 g/t silver.
Diamond drillholes BC991 and BC 992 were drilled to obtain samples for metallurgical testwork. Earlier testwork reported good recoveries of gold and silver to a sulphide concentrate. Diamond drillhole BC 993 was drilled to test the mineralised structures well below the depth of previous drilling and intersected mineralisation 250 metres down dip from surface and visually similar to that previously drilled. As is common for high grade gold mineralization grades can be quite variable and the presence of gold at depth in BC 993 is very encouraging.
More than 2 kilometers of the mapped strike of the vein system remains untested. The high grade zone, with an average width of 2 metres, has now been traced over nearly 1000 metres and up to 150 metres down dip from surface. The high grade zone remains open at depth.
Results from the three diamond drillholes are listed in the table below using a cut-off grade of 3 g/t gold:
Many of the more than 100 drillholes on the property, reported high grade intercepts between 3.0 g/t and 54 g/t gold. EurOmax is now evaluating the potential of the deposit for exploitation of this higher grade material with a low impact underground mining operation.
John C Menzies EurOmax CEO commented "the Breznik gold project continues to produce very high grade results. We will now continue a program to extend the resource along the 2 kilometres of strike which has never been drilled and to infill the 1000 metres of strike previously drilled. A second stage metallurgical testwork program will commence in the coming weeks."
Quality control and Quality Assurance
Drilling was conducted with a diamond drilling rig using PQ core in holes BC991 and BC 992 and NQ core in BC 993. Drillhole samples were prepared and assayed by SGS Chelopech laboratory in Bulgaria. SGS Chelopech follows SGS Global methods and procedures and has stringent quality control and assurance practices. Gold was assayed by a 30 gram fire assay with an AAS/ICPOES finish while other elements were assayed by a two acid digest with an ICPOES finish. Higher grades were assayed by a screen fire assay with a four acid digest with an AAS finish. Historic results reported herein were undertaken at EuroTest Control AD an ISO9001 accredited facility in Bulgaria. Quality control standards and blanks were routinely included.
Qualified Person
John Menzies, a qualified person as defined by National Instrument 43-101, supervised the preparation of the information in this release.
The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.
On Behalf of the Board of Directors
"John C. Menzies"
Chief Executive Officer
EurOmax Resources Ltd
Media and Investor Contacts
Christopher Serin
E: c.serin@euromaxresources.com
T: +1 604 669 5999
« Back